Thursday, August 28, 2008

Sam's tiling!




Sam is doing the tiling! she wanted too... so I am the full time coffee-beer-fetch-monkey

progress




bulk of construction done, pipes moved, new electrical, entering week two with no window (custom ordered bigger one due next week)

bones


Studs of the old false wall, we found another 1.5 feet back there. pushing them back. also, the studs of the ceiling are still visible. window will be wider and new skylight that can be opened was replaced.

remodeling ...during.....


Old meets new.... black electrical tape...the wonder of our time.... click on photo for larger pix..new romax taped to old cloth copper wires!

Bathroom remodel so far....before and during..





Nasty! right before the demo begins.... then after the big gutting out...the beam above the window, that used to be the where the ceiling was...

Monday, August 4, 2008

Buses on the Brewery



Buses on the Brewery at Bristol's in Colorado Springs. Great Beer! Miss the Garden of the Gods cruise before the music and beer.... Heat + air cooled engine = vapor lock! learned something new! Have book will travel. I chilled and watched the storms past over the mountains while it cooled off.